The above prefab house was assembled in Cedeira, Spain, by Madrid firm MYCC in just 3 days!
The roof and the side facades were covered with Viroc®, a light prefabricated mixture of cement and wood shavings.
The prefabricated house was assembled in the factory to check the construction, disassembled and shipped to the site and reassembled in three days, with about two weeks of final fitting.
The prefab house has high standards of energy efficiency. The fast construction time minimises emissions and makes efficient use of limited resources.